Industrial & Mining Operations

Connect plans to what happens on site

Manage engineering documents, production, and equipment in a connected workflow.

3D illustration of Industrial & Mining Operations

Can a supervisor trace a disruption back to the plan, asset, or material involved?

Engineering revisions, shift reports, and equipment records often sit apart. By the time teams connect the records, the line has already moved on and the cause is harder to confirm.

What happens in practice?

At a processing site, a supervisor sees a recurring interruption in the shift report. They compare the active work instruction with the asset and production records, then send the follow-up to the team that owns the cause.

What changes in day-to-day work?

A clear operating record
Teams can see the plan and approved revision that applied when the event occurred.
Better targeted follow-up
Assign the next action using recorded causes, assets, and affected work.
A measured rollout
Validate one line, asset group, or site workflow before expanding.

Solution scope

  • Engineering Drawing & Document Version Control

    Keep one approved drawing version in circulation, with review history, distribution and acknowledgement.

  • Assign & Track Work from Microsoft Project

    Turn an approved Microsoft Project schedule into daily assignments, blockers and progress updates that can be reviewed.

  • Production Orders & Planning

    Convert orders into shop-floor work and see material shortages and capacity conflicts before work starts.

From design to handover

Acceptance criterion

A supervisor can trace a sample event to the applicable plan, work record, and follow-up owner.

  1. Discovery

    Pick a line, workshop, or site and identify its planning and operating records.

  2. Pilot

    Connect one workflow to the document revision, shift, or asset it depends on.

  3. Handover

    Verify the trail with engineering, operations, and the site team before expanding.

What should you know before deciding?

Questions about scope, prerequisites, and how implementation works.

Where does a pilot begin?

Choose a work area with a named owner, usable records, and one issue the team can verify.

Does every machine need a connection?

Start with the sources needed for the chosen workflow. Compatible sensor feeds can be added where useful.

How is the result accepted?

Run a sample event from observation through evidence and assigned follow-up.