A late order, an obsolete drawing, or an unanswered enquiry gives us a workflow to design around and test.
01
Map the workflow
Identify the handoff that stalls, who owns each step, and where the data lives.
02
Pilot a defined scope
Select the necessary module and connections, then test the workflow on a real example.
03
Validate with the people doing the work
Check the acceptance criterion in day-to-day work and agree on operating ownership before expanding.
Common questions
Can we start with just one solution?
Yes.
Start with a workflow such as purchase requests, drawing revision control, or sales follow-up. Define its inputs, owner, and acceptance criterion before implementation.
What happens to our existing software?
Identify the source of record for each dataset and the exchange methods it supports.
Test a real sample before choosing an API, file exchange, migration, or a standalone workflow.
What should a raw material RFQ include?
Specify grade or assay, quantity and unit, delivery point and date, quality documents, and payment terms.
Compare offers on that basis so freight, grade, and lead-time differences stay visible.
Will rollout interrupt daily operations?
Pilot one workflow with a small group alongside the current process.
Agree on the cutover window, approver, and rollback plan before switching. Disruption depends on the systems and rollout scope.
What if a mine or plant has poor connectivity?
Measure coverage in the actual work areas and shifts.
Test how the proposed module handles essential work during outages, temporary capture, synchronization, and duplicates. Offline support depends on the solution scope and architecture.
How are solution and service costs estimated?
The estimate depends on scope, users and sites, migration, integrations, and custom requirements.
Separate one-time implementation costs from recurring support and infrastructure, and identify out-of-scope items in the proposal.
How do ERP, CRM, and workflow automation differ?
ERP connects orders, purchasing, production, inventory, and finance.
CRM follows customers and sales opportunities. Workflow automation routes requests, correspondence, and approvals. Start where your team does the most rework.
Where should a multi-site business start?
Pick one plant, mine, or branch and one frequent scenario for the pilot.
Document shared codes, shift differences, access, and site reporting before planning the next rollout.
What should we bring to the first meeting or demo?
Bring an anonymized form, file, or report and describe one real case.
Show who starts it, where it waits, and how your team knows it is complete.
How are Excel files and historical records migrated?
Map columns to destination fields, flag duplicates and inconsistent units, and run a trial import.
Reconcile record counts and sample records with the data owner before a full migration.
How does ERP reconcile orders, stock, production, and accounts?
Start with a shared order identifier and consistent item codes.
Trace one pilot order from reservation and shortage purchasing through production and posting to catch quantity, unit, or date mismatches.
How do we reconcile a dashboard with the operating report?
Document the formula, period, and data source for each metric.
For OEE, specify how planned downtime is treated and compare the result with the underlying shift records and report.
How is a weighbridge connected to load records?
Check the weighbridge model, available output, and load identifier.
Reconcile a sample load from gross and tare weights to its plate, route, destination, and receipt. Direct integration depends on the device and data access.
How do line stoppages become maintenance work orders?
Record the asset ID, time, and initial cause.
In the pilot, agree which events supervisors escalate to work orders and verify that the repair and return-to-service time reach the shift report.
How can we trace a batch through testing and release?
Use a shared batch identifier across production, sampling, testing, and stock.
Trace a batch through its test result and release or quarantine decision, including the approver and status history.
How does CRM help with industrial sales and long-term contracts?
Keep the technical enquiry, conversation history, quotation versions, and follow-up in the opportunity.
After a sale closes, track milestones, renewals, and obligations through contract management.
How do we track a purchase request through receipt?
Link the request, approval, enquiry, order, and receipt with a shared reference.
Mark partial deliveries and quantity discrepancies against the order so procurement and stock teams can see what remains open.
Can customers or suppliers view the status of their work?
A partner portal can be scoped to share relevant items such as enquiry status or delivery documents.
Test that each party sees only the records and actions it is authorized to access.
How do enquiries from an industrial website reach sales?
Capture the product code, technical requirements, quantity, and contact details.
Trace a sample enquiry from the product page to the sales owner, then check the response deadline and how duplicates are handled.
How should we assess handover?
Agree on a repeatable scenario and expected result before starting.
A load, for example, should be traceable from weighing through receipt. Run that scenario with real users and sample data during acceptance.
How should shift training and post-handover support work?
Plan training around each shift’s roles and scenarios, and name a contact for each team.
Specify the support channel, coverage hours, response times, and escalation route in the support agreement.
Can the solution run on company servers or a private network?
Assess hosting against IT policy, site access, equipment connectivity, and maintenance ownership.
Agree on network requirements, backups, updates, and who operates each part before choosing a deployment model.
How are user access and change history verified?
Define roles by site and workflow, then test view, edit, and approval rights separately.
In acceptance testing, confirm which changes are logged and who can read the history.
What if we need to export or restore our data?
Agree on export formats, included records and attachments, backup ownership, and recovery targets before rollout.
Trial an export and a restore to verify coverage and timing.
Select a question to read its answer.
Change begins with one workflow
Find the process that causes the most friction today. Each solution page lays out its scope, rollout, and acceptance criterion.